Toronto cost guide

Whole-home renovation cost in Toronto (2026).

A whole-home renovation in Toronto in 2026 generally runs about $60 to $100 per square foot for a cosmetic refresh, $100 to $175 for a mid-range renovation, and $175 to $350 per square foot for a full gut and rebuild. Across Toronto and the 905, that puts a comprehensive gut-and-rebuild at roughly $300,000 to $700,000 before HST, an addition or a lowered basement.

Sources: 2026 GTA renovation pricing guides — 905reno, Sosna and Maserat. Ranges are market references, not a quote for your project.

Cost by scope

ScopeTypical Toronto range
Cosmetic whole-house refresh

Paint, flooring, lighting, doors and trim, refreshed kitchen and baths. No structural or major service work.

$60 – $100 / sq ft
Mid-range renovation

New kitchen and bathrooms, some walls moved, partial electrical and plumbing upgrades, new HVAC components.

$100 – $175 / sq ft
Full gut and rebuild

Down to studs, all new services, insulation and drywall, structural changes, permits, engineering and inspections.

$175 – $350 / sq ft
Typical whole-home project total

A comprehensive gut-and-rebuild on a Toronto or 905 home, before an addition or basement lowering.

$300,000 – $700,000+

Where the money actually goes

Age and condition of the house

The biggest unknown

Knob-and-tube wiring, galvanized or lead supply lines, clay drains, balloon framing and no insulation are common in pre-war Toronto stock and each carries real cost.

Structure and engineering

Drives permits and schedule

Removing load-bearing walls, adding beams, underpinning or lowering a basement all need drawings, permits and inspection windows.

Mechanical, electrical and plumbing

Often 20–30% of a gut job

A new panel and service upgrade, full rewire, repiping and HVAC redesign are frequently underpriced in optimistic quotes.

Kitchen and bathrooms

Selection-driven

These rooms usually carry the largest allowances, so they explain most of the gap between two quotes on the same house.

Schedule, supervision and contingency

Rarely a visible line

Six to twelve months of site supervision, temporary housing and a 10–15% contingency belong in your budget even if they are not in the quote.

The anatomy of a whole-home quote

On a project this size the contract language matters as much as the total. Work down these lines and ask the question beside each one before you sign.

Quote lineWhat to ask
Scope definitionWhich drawings and specification set is this price based on, and what revision date?
Contract typeIs this fixed price, cost-plus with a fee, or an estimate that can move? Where does it say so?
Allowances scheduleWhat dollar figure is assumed for cabinets, tile, fixtures, flooring and appliances, and how are overages priced?
Permits, engineering, surveysWho applies, who pays, and what happens to the schedule if the city takes longer than assumed?
Existing conditionsWhat is assumed reusable — wiring, plumbing stacks, framing, foundation — and who carries the cost if it isn't?
Change order processHow is a change priced and approved, and what markup applies to extras?
Payment schedule and holdbackAre payments tied to completed milestones, and is the Ontario construction holdback handled properly?
ExclusionsWhat is explicitly excluded, and which of those items will you still have to pay someone for?

Frequently asked questions

How much does a whole-home renovation cost in Toronto?

In 2026, published GTA guides put a comprehensive gut-and-rebuild at roughly $150 to $350 per square foot, or about $300,000 to $700,000 for a typical home. Cosmetic whole-house refreshes can run closer to $60 to $100 per square foot.

Why do whole-home quotes vary so much between Toronto contractors?

Large quotes differ mainly in what they assume rather than in their labour rates: allowance levels, how much existing wiring and plumbing is reused, whether permits and engineering are included, and whether the price is fixed or an estimate. A 30 to 50 percent spread on the same house is common.

How much contingency should I budget?

For a gut renovation of an older Toronto home, 10 to 15 percent above the contract price is a reasonable contingency, because hidden conditions behind plaster and below the floor are only discovered after demolition.

Should I get a second opinion before signing a large renovation contract?

On a project of this size a review is cheap insurance. Arden reviews your quote for $49 and shows you the missing scope, thin allowances and contract terms to raise before you sign.

About to sign a large renovation contract?

Upload the quote and Arden runs a free preliminary scan, then a full owner-side review of the pricing, scope, allowances, contract terms and the questions to send your contractor.

One-time purchase · No subscription

Keep reading